Delivery, installation and implementation of active equipment and passive equipment Active equipment.
Travel costs for more than 10 km from the seat (without tolls)
Access point installation
Metal channel installation
Installation of flexible plastic conduit in to the wall
Installation of flexible plastic conduit on wall with clips
Plastic channel installation
Drilling through slabs and walls thicker than 40 cm – per drill
Drilling through slabs and walls up to 40 cm – per single drill
Connector installation on plastic hose/micro-tube
Outdoor installation of plastic hose/microtube
Indoor installation of plastic hose/microtube by laying an internal installation in PVC / metal channels
Aerial installation of plastic hose/microtube